Auburndale Project (Episode 8)

EPISODE:

Episode Info

Patching sidewall shingles on the front of the house; installing ductwork for the heating-and-cooling system; installing a pocket door. Later, an energy-efficient storm door is installed; copper plumping pipes and fittings are cut and soldered; and an overgrown privet hedge is trimmed.

Cast