Cambridge Project (Episode 4)

EPISODE:

Episode Info

The crew begins work on the first-floor ceiling; a skylight is added to the master suite. In the second half: laying sod in a yard; measuring without doing math; installing a wireless thermostat to control a heating system.

Cast